Quality control for outdoor playground equipment

Quality control for outdoor playground equipment



  • Check Raw material at the point of delivery from supplier. Before it goes into the warehouse (any rejected material to be separated and disposed of or returned to supplier).
  • Cut all material (Inform the Quality control manager when ready)
  • Check cut material (Reject any material that has not been cut to the correct length (any rejected material to be separated and disposed of) (Inform the Production manager when the inspection is finished include the results).
  • Check all welded areas for weld quality. Check for small holes and reject if any are found (Any rejected parts should be separated and sent back to the welding department to be fix) Once the welding department have fixed the problems and the parts have been polished the parts must be rechecked and the process must be repeated until the parts pass Quality control (Inform the Production manager when the inspection is finished include the results).
  • Sand Blast
  • Weld protection (Zink Powder / ZRC treatment)
  • Inform the Quality control manager when ready .Check the Weld protection has been applied to all areas where welding has taken place. (Inform the Production manager when the inspection is finished include the results).
  • Powder coat
  • Inform the Quality control manager when ready,Check paint quality for scratches, small holes and bad paint coverage. Reject any parts that don’t meet the high standard the customer requires (Any rejected parts should be separated and fixed by the paint department before continuing (Inform the Production manager when the inspection is finished include the results).
  • Assemble to the exact specification required by the customer (Inform the Quality control manager when ready).
  • Check completed equipment for paint quality and function please make a list of all problems you find with the equipment and pass these lists to the Production engineering manager if the equipment has no problems please put 1 QC passed sticker on the flange and sign it.
  • Fix all problems listed by Quality control and tick them off the list until they are all fixed (Production engineering team will also come up with the long term solution to fix the problems during production) (Inform the Quality control manager when ready).

评论

此博客中的热门博文

Playground equipment-How Inclusive Playgrounds Benefit Everyone

the placement of playground equipment need to pay attention

The meaning of Outdoor fitness equipment